VIGOR GPS NO Screen Smartwatch Man Woman SOS Real-time Location Fitness Tracker Heart Rate Blood Pressue 2026 New Bracelet

VIGOR GPS NO Screen Smartwatch Man Woman SOS Real-time Location Fitness Tracker Heart Rate Blood Pressue 2026 New Bracelet

black
$87.00
Skip to product information
VIGOR GPS NO Screen Smartwatch Man Woman SOS Real-time Location Fitness Tracker Heart Rate Blood Pressue 2026 New Bracelet

VIGOR GPS NO Screen Smartwatch Man Woman SOS Real-time Location Fitness Tracker Heart Rate Blood Pressue 2026 New Bracelet

$87.00

Free Shipping Included — already built into the price

Color

SPECIFICATIONS

Activity Tracked: Steps Tracker,Distance Tracker,Calorie Tracker,Activity Tracker

App name: G BAND

Application Age Group: Adult

Band Material: Weaving

Band length[mm]: 268mm

Band width[mm]: 20mm

Battery Capacity(mAh): 220-300mah

Battery Detachable: No

Battery Life: 5

Bluetooth-compatible Version: 3.0 and 5.1BLE dual mode

Brand Name: luxuglow

CPU Model: JL7013A7

Case Material: Alloy

Category: Smart Watches

Compatibility: All Compatible

Display Size: 0

Feature 1: blood pressure monitoring

Feature 10: Real time location sharing

Feature 11: SOS Fall Monitoring

Feature 2: blood oxygen monitoring

Feature 3: Fitness monitoring

Feature 4: Sports monitoring

Feature 5: 5-7 days Battery Life

Feature 6: GPS Security protection function

Feature 7: Smartwatch For man

Feature 8: Smartwatch For woman

Feature 9: Smartwatch For woman

Function: Shock Resistant,Passometer,fitness tracker,sleep tracker,Message Reminder,Call Reminder,Remote Control,Alarm Clock,Calorie Counter,Heart Rate Tracker,GPS,SOS Alert,Fall Detection

GPS: Yes

High-concerned chemical: None

Language: English,Russian,Spanish,Polish,Portuguese,Turkish,Italian,French,German,Norwegian,Korean,Japanese,Ukrainian,Hebrew,Dutch,Arabic,Indonesian,Greek

Launch Date: 2026

Mechanism: Yes

Metrics measured: Heart Rate Monitor,Women's Health Monitoring,Other,Blood Oxygen Monitor,Sleep Monitor,Blood Pressure Monitor,Body Temperature Monitor,Stress Monitor

Multiple Dials: No

Network Mode: None

Origin: Mainland China

RAM: 256 MB

ROM: 256 MB

Rear Camera: None

Resolution: 0

SIM Card Available: No

Screen Material: Black & White LCD

Screen Shape: SQUARE

System: Android Wear,Android OS,iOS

Touch Screen: no

Type: On Wrist

Voice assistant built-in: no

WIFI: no

Waterproof Grade: Life Waterproof

Features:

* Safer and more assured: AI health analysis, scientific insights, and more direction for health. Built-in fall detection and SOS emergency call, when an accident occurs, it can promptly remind you to ask for help.

* Health monitoring: Built-in 6-axis sensor, accurately monitors exercise and body status, and comprehensively tracks health data in real time, including heart rate monitoring, 24-hour scientific sleep monitoring, blood oxygen monitoring, heart rate variability (HRV) monitoring, stress monitoring and other health functions.

* Activity tracking: GPS real-time positioning, all-weather automatic activity tracking, supports more than 100 exercise modes, and clearly and intuitively displays activity duration, exercise time and calorie consumption. Automatically recognizes running, cycling, strength training and other sports scenes, allowing seamless tracking without manual operation. Real-time location sharing to protect the whole family.

* 1ATM waterproof and dustproof: No need to worry about splashes or rain, it is dustproof and resistant to daily wear and tear, can be used anytime and anywhere, with strong reliability.

* Super long battery life: Equipped with a 220mAh polymer lithium battery and optimized power-saving algorithm, it has excellent battery life. Magnetic charging design with charging base. After fully charged, it can be used for about 5-7 days (extreme use) and 7-10 days (regular use). The standby time is up to 20 days, completely eliminating battery anxiety. After being fully charged, start your health journey anytime and anywhere.

【Main Features】:GPS, Alarm clock, remote camera, fall detection SOS. Call reminder, SMS reminder, sedentary reminder, drinking water reminder, distant view reminder, medication reminder, reading reminder, travel reminder, hand washing reminder Language 

【APP language】:English, Japanese, Korean, German, French, Spanish, Arabic, Russian, Chinese, Ukrainian, Italian, Portuguese, Dutch, Polish, Swedish, Finnish, Danish, Norwegian, Hungarian, Czech, Bulgarian, Romanian, Slovak, Latvian, Indonesian, Thai, Turkish, Vietnamese, Hindi, Pashto, Lithuanian, Estonian, Slovenian, Croatian, Greek, Filipino, Hebrew, Malay, Serbian, Persian. When you find that the device cannot be searched, be sure to check if the wristband is turned on. The wristband needs to be used with the device turned on.

Specification:

Name: Smart Bracelet

Material: Zinc Alloy + PC + Aluminum Alloy

Strap Material: Nylon Strap

APP: G BAND

Bluetooth: BLE 5.3 / BT 3.0

Chip: JL7013A7

AFE: HX3917

PPG Heart Rate Sensor: Jufei RA2325

GPS Chip: CC1165

Flash: 128Mb

Voltage: 3.8V

Battery: 220mAh High-Capacity Lithium Polymer Battery

Charging Method: Magnetic Charging

Charging: 5V≥500mA

Charging Time: Less than 2.5h

Standby Time: 15-20 days

Usage Time: 7-10 days (Regular Use), 5-7 days (Extreme Use)

Compatible Systems: Compatible with iOS 13.0+, Android 8.0+

Water Resistance Rating: 1ATM

Strap Size: 20mm

Device Dimensions: 8.2*22.3*39.9mm

Color: Black

Packing included: 

1 x Smart Bracelet

1 x Charging Dock

Note:

1. Due to manual measurements and slight color variations, please allow 1-3 cm (0.4-1.18 inches) difference to suit different display settings.

2. Due to the light and screen difference, the item's color may be slightly different from the pictures. Please understand.

You may also like

Free Shipping Included — already built into the price